Management Activities

Pearl Creek Farm: 8878 N Farm Road 75, Walnut Grove MO 65770

Summary Data | All Data

All | Controlled Burn | Farming | House maintenance | Invasive control | Landscape | Native collection | Native propagation | Science | Wildlife

Date Type Location Activity
2020-06-27 House maintenance Home: Workshop Replaced main door on workshop
2020-05-25 House maintenance Home: House Cleaned out gutter at front door
2020-05-10 House maintenance Home: Workshop Swept oak debris from roof
2020-05-10 House maintenance Home: House Swept oak debris from roof
2020-05-04 House maintenance Home: D4 Shored up retaining wall on south side of house
2020-04-12 House maintenance Home: House Set stones back into front porch
2020-04-12 House maintenance Home: House Fixed gutter near front porch
2019-11-04 House maintenance Home: House Measured and marked foundation slippage
2019-05-31* House maintenance Home: House Installed new water softener system
2018-10-07 House maintenance Home: House Shored up deck from rotting support post
2018-07-01 House maintenance Home: Workshop Cleaned and organized workshop
2018-03-01* House maintenance Home Setup new composting site just below rain collection tank
2018-02-18* House maintenance Home: Shed Moved rain collection tank to west side of shed
2016-06-22 House maintenance Home: Workshop Swept oak debris from roof
2016-06-22 House maintenance Home: House Swept oak debris from roof
2014-01-07 House maintenance Home: House Kitchen water pipes burst after two nights of record cold temperatures
2012-11-21* House maintenance Home: House Built deck railing
2012-01-08* House maintenance Home: C4 Sold propane tank
2011-11-22 House maintenance Home: House Removed fallen ash tree from northeast corner of house (over master bedroom)
2011-01-25* House maintenance Home: House Kitchen remodeling to accommodate new refrigerator
2010-11-12* House maintenance Home: House Installed new geothermal heating and cooling system
2010-04-29 House maintenance Home: House Swept oak debris from roof
2010-04-29 House maintenance Home: Workshop Swept oak debris from roof
2009-06-14* House maintenance Home: Workshop Swept oak debris from roof
2009-06-14 House maintenance Home: House Swept oak debris from roof
2009-06-03* House maintenance Home: House Replaced bathtub in master bathroom
2009-04-13* House maintenance Home: House Finished basement with two bedrooms and a family room
2007-12-27* House maintenance Home: House Moved in
2007-11-30 House maintenance Home: House Inspection day

A total of 29 rows are displayed.

An asterisk (*) denotes an activity date that is approximate. See notes for details.